Kniha Project Management with Dynamic Scheduling Mario Vanhoucke

Project Management with Dynamic Scheduling

Jazyk: Angličtina
Vazba: Pevná
Vydavatel: Springer
Dostupnost: 50 % šance
Prohledáme celý svět
2 662
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of p...

Informace o knize

Jazyk
Angličtina
Vazba
Kniha - Pevná
Vydáno
2012
Stránek
310
EAN
9783642251740
ISBN
3642251749
Enbook ID
01229675
Vydavatel
Hmotnost
627
Rozměry
165 x 245 x 24

Kompletní popis

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Leuven Gent Management School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project s time and cost reserves.

Mohlo by vás zajímat

Chloroplast Biogenesis

Udaya C. Biswal
3 426
1 539

Rev Me Up

Kylie Gilmore
315

MACROLEPIDOPTERA OF THE WORLD

Adalbert 1860-1938 Seitz
516
283

Tarot

JEFF NEVES
543
2 086

Living with Wine

Samantha Nestor
1 464
180

Without Warning

Lynette Eason
391
1 688

PUPIL AS SCIENTIST

Rosalind Driver
850

Zákaznicí kteří koupili tuto knihu koupili také

494

18 STUDIES OP. 109 PIANO

FRIEDRICH BURGMULLER
473
152